Long lead times contribute to which risk?

Answers

Answer 1

Risk of obsolescence

Lead time is the amount of time that passes from the start of a process until its conclusion.

Reduction in lead time can streamline operations and improve productivity.

Lead time measures how long time it takes to complete a process from beginning to end.

Lead time = pre-processing time + processing time + post-processing time.

goods with long lead times run the risk of obsolescence by the Manufacturing time. When a product has a short turnaround window, the company runs a small risk of the good no longer being in demand by the time it is finished. A shorter lead time may lead to fewer labors cost.

To know more about Lead Time:

https://brainly.com/question/26577133

#SPJ4


Related Questions

2. The owner of a franchise benefits from brand name recognition, access to professional
and nationwide advertising.

Answers

Answer:

True

Explanation:

It is TRUE that the owner of a franchise benefits from brand name recognition, access to professional and nationwide advertising.

This is because the owner of a franchise has various advantages. The advantages include enhanced reputation which covers all the places there is a franchise.

Then there is an increase in management techniques and work practices, including access to national advertising to cover many places and continuous support.

Pete would like to respond only to users within his organization with an automatic reply. He is configuring the automatic response. Which option should he select?

answer b

Answers

Answer: B: Inside my organization tab

Explanation: edge 2021 unit review

Forrester Company is considering buying new equipment that would increase monthly fixed costs from $120,000 to $150,000 and would decrease the current variable costs of $70 by $10 per unit. The selling price of $100 is not expected to change. Forrester's current break-even sales are $400,000 and current break-even units are 4,000. If Forrester purchases this new equipment, the revised break-even point in units would:

Answers

Answer:

"Decrease by 250" is the appropriate response.

Explanation:

The given values are:

Revised fixed cost,

= $150,000

Current selling price,

= $100

Current variable cost,

= $60

Current contribution will be:

=  [tex]Current \ selling \ price-Current \ variable \ cost[/tex]

=  [tex]100-60[/tex]

=  [tex]40[/tex]

Now,

The revised BEP will be:

=  [tex]\frac{Revised \ fixed \ cost}{Revised \ contribution}[/tex]

On substituting the values, we get

=  [tex]\frac{150,000}{40}[/tex]

=  [tex]3750 \ units[/tex]

hence,

=  [tex]4000-3750[/tex]

=  [tex]250[/tex]

Thus the above is the correct answer.

ESTIONS
Discuss FOUR phases of business cycle in detail​

Answers

Answer:

The answer is below

Explanation

1. Expansion: this is a period in which business is growing at a considerable rate. Such as an increase in production and sales

2. peak: this is a period in which production and prices increase beyond the normal level. This shows there is no longer room for increment.

3. contraction: this is a period in a business cycle in which the productions and sales began to fall due to low patronage and a bad economy.

4. Trout: this is a peak period in which business models lost their values in terms of production and sales. At this point, it is believed that the business cannot get worse.

Often, an objection is simply a request for

A. a discount

B. a different salesperson

C. more time

D. more information

Answers

Answer:

C. and D.

Explanation:

An Objection is when a certain something strongly disagrees with a reasoning But that reasoning can be very challanging to be dealt with. an expression or feeling of disapproval or opposition; a reason for disagreeing.

If you could completely remove something you put online forever, what would it be?

Answers

Answer: Nothing, I just want it all if I would remove something I would of tell you. But I don’t. :)

Explanation:

A water main downtown broke this morning, so several businesses had no water for hours. a. addition b. time c. comparison d. cause and effect 2. Even though most Americans are primarily concerned about AIDS as it exists in the U.S., it should be remembered that it is now nearly a worldwide disease. a. addition b. time c. contrast d. comparison 3. Larry will probably be a late bloomer socially, just like his older brothers. a. time b. contrast c. comparison d. cause and effect 4. There are ways you can make

Answers

Complete Question:

4. There are ways you can make boring tasks more pleasant. For instance, bring a portable radio and listen to music on the earphones while you work.

Answer:

1. D

2. C

3. C

4. Illustration or example.

Explanation:

1. Cause and effect can be defined as the relationship between two things or events in which an occurrence one (cause) leads to the occurrence of another (effect).

2. A contrast is typically used to show the difference between two concepts, people, place or objects. For example, AIDS doesn't exist only in US but it's now a worldwide disease.

3. Comparison involves the process of showing the relationship or similarities between two concepts, people, place or objects.

4. An illustration or example is used to describe a situation by sighting or sharing a real-life experience.

A assessment may alter the content of a sales pitch.

True
False

Answers

The answer is true

This is because a assessment is a process of determining needs, and or gaps between conditions. And a sales pitch is a sales presentation where a salesperson explains the benefits of their business.

Knowing all of this information, a needs assessment can alter the content of a sales pitch.

What is another name for administrative law?

Answers

Answer:

Regulatory law

Explanation:

Administrative law is an arm of public law and is also known as “regulatory law.”

which of the following is a person who authorized an agent to act on his or her behalf ​

Answers

Answer:

Principal

Explanation:

A power of attorney (POA) is a legal document giving one person (the agent or attorney-in-fact) the power to act for another person (the principal).

Aleisha wants to buy a condominium. She has the choice of buying it now or renting it with the option to buy at the end of 4 years. If she rents now, she must pay a deposit of $1,500 and pay rent of $865 per month. If she buys, she would need closing costs and her mortgage payment would be $844 a month for 4 years. How much would her closing costs need to be in order for the cost to buy to be the same as the cost to rent

Answers

Answer:correct option is b. $2,508Step-by-step explanation:given datafor rent deposit = $1,500rent = $865 per monthtime = 4 yearmortgage payment = $844to find outHow much would her closing costs need to order for the cost to buy to same as cost to rentsolutionfirst we get here Total payment by monthly payment for 4 year rent isTotal payment = $865 × 4 year × 12 monthsTotal payment for rent = $41520and so the total amount pay in rent istotal amount pay in rent = Amount deposited + Total payment   ..............1total amount pay in rent = $1500 + $41520total amount pay in rent = $43020andnow we get total payment by monthly payment for 4 year when buytotal payment =  $844 × 4 year × 12 monthstotal payment for buy = $40512and now we consider here closing costs for buying =  xsototal amount pay in buy = total payment + closing costs   ..............2total amount pay in buy = $40512 + xso here cost to buy to be same as cost to rent so$40512 + x = $43020x = $2508so here closing costs will be $2508so correct option is b. $2,508:

discuss the impact of discriminating behaviour the individual and society​

Answers

Discriminating behaviour has the following impact on the individual and society:

It can lead to conflict and unrest in the society.It can lead to low self esteem and depression.

What is discrimination?

Discrimination is when a person is treated unfairly and differently from other people based on age, gender, religion or race.  For example, a person of colour might be denied entry into a restaurant based on her skin colour.

To learn more about discrimination, please check: https://brainly.com/question/22843559

Which of the following laws limits the hours and types of duties in which teens can work​

Answers

Fair Labor Standards Act

Read the scenario below and then answer the question. Sample scenario: Scientists have created a new grass seed that stops grass growth at a specific length, eliminating the need to mow the lawn. The price of this seed is high, but many consumers still want to use it. As a result, several different producers supply a large amount of this seed to consumers. In order to attract consumers to their product, some producers lower their prices and supply fewer bags of seeds. What is the best description of the grass seed that is described in this scenario

Answers

Answer: a good with an elastic supply

Explanation:

Price elasticity of supply simply refers to how the changes in market price of a good bring about a responsiveness to the supply of such good.

Based on the information given, the best description of the grass seed that is described in this scenario is that it's a good that has an elastic supply. This is because the price of the good in thus case, is sensitive to the changes in the price.

Answer:

It's a good with an elastic supply

Explanation:

edge 2021

Personal selling used to be more common.

True
False

Answers

The answer is true as in true
Answer : true personal selling used to be more common


If the forecast called for the temperature to drop to 35 degrees for two weeks, what would
happen to the supply and demand for lemons?

Answers

Answer:

Well the lemons would overall stop growing. Cause they would get to cold and say brrrr! So naturally the fruit stop growing cause it's trying to stay warm. The overall product would slow down then. Also if the coldness was imediate then it would out the lemons into shock.

Please mark Brainlyest and say thanks ❤️

the supply and demand would increase due to the hot weather and the sudden rate of things such as lemonade stands. this would mean that the weather would act as an extension strategy for any lemonade businesses, and also for the supermarkets in which they’re bought from.

a A rocket shoots up 123 meter
i. What is its initial velocity -​

Answers

Answer:

Initial Velocity= 49 m/s

Time period= 5 secs

Explanation:

THIS IS THE COMPLETE QUESTION BELOW

A rocket shoots up 123 meters. What is it initial velocity?How long is it ascending

The initial velocity can be calculated using the expression below

u= √( 2gh)

Where g= Acceleration due to gravity= 98 m/s^2

h= height

Substitute the values we have

u = √(2*9.8*123)

u=√( 2410.8)

u = 49 m/s

the time period can be calculated as

(49/9.8)

= 5 sec

Hence time period is 5 secs

Which statement best explains why the United States grew into a world
economic power in the 20th century?
O A. The United States prevented other countries from abandoning the
gold standard.
O B. The United States increased its participation in international trade.
C. The United States put effective trade barriers in place to limit trade
with other nations.
D. The United States stayed out of major world wars and instead
made economic investments.

Answers

Answer:

B. The United States increased its participation in international trade.

Explanation:

The correct option is - B. The United States increased its participation in international trade.

6. Identify a change in technology during each of the time periods in history below that you believe improved the
way marketing activities were completed. List the example and explain how it contributed to marketing during
that time.
(a) 1900s to 1930s
(b) 1930s to 1950s
(c) 1950s to 1980s
(d) 1980s to today
Answer:

Answers

Answer:

Prior to the 1950s, the production orientation generally held true due to the growing numbers of affluent and middle class people that capitalism had created.

Say’s Law states that the “production of commodities creates, and is the one and universal cause which creates, a market for the commodities produced”.

The emphasis of firms adopting a production orientation of marketing would have been based on the theory of economies of scale, which are the cost advantages that an enterprise obtains due to expansion.

The Two types of wills are:
- formal and holographic
- legal and fake
- formal and casual
- none of the above

Answers

3 won I think if not sorry


Communication may account for as much as____ of a hiring decision.

a. 25%
b. 40%
c. 65%
d. 80%

It isnt d or b. So its either a or c.

Answers

The answer is A
I hope this helps
The answer is going to be a

Why is it important that your resume, cover letter, and job application all contain the same information?

Answers

Answer:

A cover letter is an important way to showcase how your unique combination of skills and experience meet the key requirements of the job description. It is your chance to show a clear link between your knowledge, experience and abilities and the needs of the employer.

Explanation:

Businesses like to keep operating costs as low as possible, so they can focus on
production and profit. One way to keep operating costs down is to keep wages
low. Many businesses pay their workers the minimum wage required by law.
Often; workers consider this unfair and feel they should be paid more than the
bare minimum for the work they do. Paying employees the minimum wage is
certainly not illegal, but is it always ethical? What do you think?*

Answers

Answer:

No I don't think it is very ethical to only be paying employees minimum wage. The cost of living keeps going up and people need to be able to afford the basic necessities of life. The prices of everyday goods like groceries and household basics keep going up making it hard for people to be able to afford them especially when they are only making minimum wage. When the product cost is higher, the company is making more profit, therefore they are able to pay their workers more. When the prices of goods and products increase, wages should increase as well.

Explanation:

30 points please help!
Olive's organic Baby food believes their reputation is being put down by a competitor because of their untruthful advertising. Which of the following types of business tort is this?
a. fra ud
b. crim inal
c. defam ation

Answers

Answer:

i believe is fraud

Explanation:

if you find it helpful pls give me the points


What is an example of a common part of a company's brand that would be represented in television
commercials?

Answers

Answer:

logos, product, company's name, :DDD and endorsers

Which aspect of diversity can be positive or negative? A (blank) can be negative or a positive.

Answers

Answer:

Positive aspects of diversity is that no one is the same. Everyone is  their own person. There is no negative to diversity. It is the people themselves who think negativly of diversity often by discrimination.

Explanation:

i hope this helped and was on point and I'm sorry if it wasn't. I just stumbled on your question...

Answer:

stereotyping

Explanation:

IZSA
11. Laser Research, Inc., is sending their five-person research team to a three-day conference to
learn a new automated lab procedure. One researcher earns $336 daily, two earn $360 daily.
and two earn $390 daily. What will the three-day conference cost Laser Research, Ine, in
lost productivity for the five researchers?

Answers

Answer:

The three-day conference will cost Laser Research, Inc. $ 5,508 in lost productivity.

Explanation:

Given that Laser Research, Inc., is sending their five-person research team to a three-day conference to learn a new automated lab procedure, and one researcher earns $ 336 daily, two earn $ 360 daily and two earn $ 390 daily, to determine what will the three-day conference cost Laser Research, Inc, in lost productivity for the five researchers, the following calculation should be performed:

336 x 3 + 360 x 2 x 3 + 390 x 2 x 3 = X

1,008 + 720 x 3 + 780 x 3 = X

1,008 + 2,160 + 2,340 = X

5.508 = X

Thus, the three-day conference will cost Laser Research, Inc. $ 5,508 in lost productivity.

How do you give bainliest

Answers

After 2 people answer on-top of their name will have the option for you to choose which answer is the most helpful to you

You can buy a computer with your credit card and pay for it over the course of one year. With an interest rate of 16 percent, you would need to pay $181.46 for 12 months to pay off the charge. You can rent the computer for 12 months for $200 per month and, at the end of the rent period, buy it for $300. How much will you save by purchasing the computer with your credit card instead of using the rent-to-own plan?

Answers

Answer:

you can save $522.48 by purchasing the computer with the credit card

Explanation:

total money paid to the credit card company = $181.46 x 12 = $2,177.52

total money paid for renting the computer = $200 x 12 = $2,400, plus the final payment = $2,400 + $300 = $2,700

money saved by using the credit card = $2,700 - $2,177.52 = $522.48

Which of the following is a true statement?
1) FAS Market Development and Export Assistance partners with over 100 cooperator groups
2) FTC stands for Federal Trade Commission
3) FAS stands for Federal Agricultural Sector
4) Imports are goods produced in one country then shipped to another country​

Answers

Answer:

2) FTC stands for Federal Trade Commission

Explanation:

The true statement is that, FTC stands for Federal Trade Commission.

The Federal Trade Commission (FTC) is an agency of the government of the United States of America saddled with the responsibility of promoting consumer protection and the enforcement of all civil antitrust laws.

Basically, the laws formulated or established by the FTC are to provide protection for consumers of various goods and services while requiring that businesses do not make false claims about them. Also, the Federal Trade Commission (FTC) is responsible for competition regulations among manufacturers of goods and services provided for the consumers.

Other Questions
) Cars are parked in line as they come off the assembly lines. There are three models: red cars which take up 2 spaces, blue cars which also take up 2 spaces, and green cars which take up only 1 space. Let an be the number of ways of filling the first n parking spaces with red, blue and green cars. help me please Iknow it's easy but I need answers asap When people are infected with influenza virus, they...A. Experience uncomfortable symptoms as their body fights the virus.B. Might feel worse depending on how much exposure theyve had to the virus.C. Can combat the virus by immediately getting a vaccination.D. Will start to feel better when their body begins fighting the infection.Will give brainliest... Which of the following happened first?a.Peasant Crusaders attacked Jews in Germany.b.Saladin successfully defended Jerusalem against King Richard I.c.Crusaders attacked Constantinople.d.Pope Urban II called on Christians to fight the Muslim Turks.Please select the best answer from the choices providedABCD HELP HELP HELP!! ILL MARK BRAINLIEST Rank each country that was most at fault of beginning World War One, Serbia, Austria-Hungary, Germany, Russia, France, Italy, Great Britain. Rank from 1-7, 7 being least to blame, and 1 being most to blame. Explain why you ranked most to blame and least to blame. Contribution Income Statement and Cost-Volume-Profit Graph Picnic Time produces a picnic basket that is sold for $100 per unit. Assume the company produced and sold 4,000 baskets during July. There were no beginning or ending inventories. Variable and fixed costs follow. Variable Costs per Unit Fixed Costs per Month Manufacturing: Manufacturing overhead $36,000 Direct materials $25 Selling and administrative 68,000 Direct labor 15 Total $104,000 Manufacturing overhead 5 $45 Selling and administrative 4 Total $49RequiredPrepare a contribution income statement for July.Do not use any negative signs with your answers.Picnic TimeContribution Income StatementFor the Month of JulySalesAnswerLess variable costsDirect materialsAnswerDirect laborAnswerManufacturing overheadAnswerSelling and administrativeAnswerAnswerContribution marginAnswerLess fixed cost:Manufacturing overheadAnswerSelling and administrativeAnswerAnswerProfitAnswer can you help me i will mark if i can A machine used to fill beverage cans is supposed to put exactly 12 ounces of beverage in each can, but the actual amount varies. The standard deviation of fill volumes is 0.05 ounce. How large a sample of cans must be selected to estimate the population mean fill volume with a 95% confidence interval that has a margin of error of 0.008 ounce? Round your answer UP to the nearest integer. At Yogurtland, the scale says that Brooke has 9 ounces of chocolate yogurt in her cup. Brielle's yogurt weighs 13 ounces. How many pounds of frozen yogurt did they buy altogether? Express your answer as a mixed number. 2. Find the length of AD if the length of AB is14 units, the length of BC is 5 units, and thelength of CD is 8 units Do you believe in the single bullet theory or a conspiracy theory in the assassination of John F. Kennedy? 5Given volume of rectangular prism is 432 m.h12 m4 mFind height? You have your choice of two investment accounts. Investment A is a 6-year annuity that features end-of-month $1,980 payments and has an interest rate of 7 percent compounded monthly. Investment B is an annually compounded lump-sum investment with an interest rate of 9 percent, also good for 6 years.How much money would you need to invest in B today for it to be worth as much as Investment A 6 years from now? (Do not round intermediate calculations and round your answer to 2 decimal places, e.g., 32.16.) g Travis and Jeff own an adventure company called Whitewater Rafting. Due to quality and availability problems, the two entrepreneurs have decided to produce their own rubber rafts. The initial investment in plant and equipment is estimated to be $2,000. Labor and material cost is approximately $5 per raft. Of the rafts can be sold at a price of $10 each, what volume of demand would be necessary to break even Audria rode her bicycle for 2 hours. She drove a total of 21 miles. At this rate, how many miles will she bike in hour? A 612 6 1 2 B 634 6 3 4 C 534 5 3 4 D 514 Help????? I dont know which is right A rectangle measures 2 1/2 meters by 1 3/4 meters. What is its area? What is (0, 2) reflected over the x-axis Which set of sex chromosomes do females have